Engine Assembly - Mitsubishi Lancer Evolution-IV Workshop Manual

Hide thumbs Also See for Lancer Evolution-IV:
Table of Contents

Advertisement

ENGINE ASSEMBLY

REMOVAL AND INSTALLATION
Pre-removal Operation
(1) Fuel Discharge Prevention
(2) Hood Removal
(3) Strut Tower Bar Removal
(4) Air Hose C Removal
(Refer to GROUP 15 – Intercooler.)
(5) Radiator Assembly Removal (Refer to GROUP 14.)
(6) Under Cover Removal
(7) Front Exhaust Pipe Removal (Refer to GROUP 15.)
Delivery pipe
17
O-ring
Engine oil
Removal steps
1. Center cover
2. Accelerator cable
3. Brake booster vacuum hose
connection
4. Vacuum hose connection
5. Throttle position sensor connector
6. Idle speed control motor connector
7. Heater hose connection
8. Ignition coil connector
9. Crank angle sensor connector
10. Oxygen sensor connector
ENGINE –
15
10 – 12
{1.0 – 1.2}
14
16
17
18
6
4
5
7
Engine Assembly
Post-installation Operation
(1) Front Exhaust Pipe Installation
(Refer to GROUP 15.)
(2) Under Cover Installation
(3) Radiator Assembly Installation
(Refer to GROUP 14.)
(4) Accelerator Cable Adjustment
(5) Air Hose C Installation
(Refer to GROUP 15 – Intercooler.)
(6) Strut Tower Bar Installation
(7) Hood Installation
10 – 12
{1.0 – 1.2}
12
13
8
8
3
11. Injector connector
12. Cam position sensor connector
13. Coolant temperature sensor con-
14. Coolant temperature gauge unit
15. Vacuum pipe/hose assembly
16. Control harness
"CA 17. High-pressure fuel hose connection
18. Fuel return hose connection
1
5 {0.5}
2
9
11
10
Unit: Nm {kgf@m}
nector
connector
11-32
3 {0.3}

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lancer evolution-v

Table of Contents