14-6
WATER HOSE AND WATER PIPE
REMOVAL AND INSTALLATION
Pre-removal and Post-installation Operation
(1) Coolant Draining and Refilling (Refer to P.14-2.)
(2) Air Hose C Removal and Installation
(Refer to GROUP 15 – INTERCOOLER.)
(3) Air Control Valve Bracket Removal and Installation
(Refer to GROUP 15 – AIR CONTROL VALVE.)
41 {4.2}
13
10 {1.0}
13 {1.3}
2
48 {4.9}
Removal steps
AA" "CA 1. Radiator upper hose connection
AA" "CA 2. Radiator lower hose connection
3. Water hose
4. Water hose
5. Water inlet fitting
"BA 6. Thermostat case assembly
7. Water hose
8. Water hose
ENGINE COOLING –
3
24 {2.4}
6
1
5
10
24 {2.4}
8
14
Water Hose and Water Pipe
4
13 {1.3}
41 {4.2}
9
10 {1.0}
Unit: Nm {kgf@m}
"AA 10. O-ring
"AA 12. O-ring
7
12
11
6
f3mm
Semi-drying sealant:
THREEBOND 1207F
9. Heater hose connection
11. Water inlet pipe
D Turbocharger (Refer to GROUP 15.)
13. Water pipe assembly A
14. Water pipe assembly B