TOHATSU M 60C Owner's Manual page 22

Hide thumbs Also See for M 60C:
Table of Contents

Advertisement

22
INSTALLATION
2 Detach the throttle and shit cable
joints by removing the R-pins.
3
Screw the tip of the remote control
cable into the cable joint up to
approx. 10 mm (0.39 inch), then lock
them with a lock nut. Here, apply
grease to the hole of the cable joint.
3 Move the remote control lever to
the "FORWARD" "NEUTRAL" and
"REVERSE" positions to confirm
that the shift is working properly,
then set the lever to "NEUTRAL".
4 Double-check that the remote control
cables (i.e., the throttle cable and shift
cable) have been connected correctly.
Move the remote control lever forward
to the first point at which it engages
(approx. 32). The cable which moves
first when the lever is turned should
be the shift cable. Check that the
shift lever is in "NEUTRAL" position
and that the neutral warm-up lever is
fully closed when the remote control
cables have been connected.
������������
* The advancer arm on the engine
s h o u l d b e c o n t a c t w i t h t h e
stopper of the cylinder crank case
assembly so that the throttle valve
of the carburetor is to be fully
closed condition.
�������
�������
�����
������������

Advertisement

Table of Contents
loading

This manual is also suitable for:

M 70cx

Table of Contents