Install Field Insulation - Carrier 19FA Series Installation Instructions Manual

50/60 hz hermetic centrifugal liquid chillers hfc-134a
Hide thumbs Also See for 19FA Series:
Table of Contents

Advertisement

Click here for Figure 23 — COMM1 CCN Communication Wiring for Multiple
Chillers (Typical)
Click here for Figure 24 — Typical 19FA With Free-Standing Starter
Click here for Figure 25 — Field Wiring (Low Voltage Motors) of PIC (Product Inte-
grated Control) Free-Standing Starter

Install Field Insulation

Apply insulation as specified in the job data and
(above) indicates a significant loss of the 10 psig (68 kPa) holding charge, the machine may
require dehydration. Do not apply insulation before dehydration.
Standard factory insulation covers the compressor motor shell, motor end cover, motor
cooling line, and refrigerant drain from the compressor. Field coverage may include the
compressor suction housing and suction elbow, flash economizer, and the cooler. The
approximate square footage required for insulating this area is given in
Figure
26. If the pressure gage reading
Table
3. When