Installation Start-Up Request Checklist - Carrier 19FA Series Installation Instructions Manual

50/60 hz hermetic centrifugal liquid chillers hfc-134a
Hide thumbs Also See for 19FA Series:
Table of Contents

Advertisement

Machine Model Number: 19FA
To:
Attn:
The following information provides the status of the chiller installation.
1. The machine is level.
2. The machine components are installed and connected in
accordance with the installation instructions.
3. The isolation package and grouting (if necessary)
are installed.
4. The relief valves are piped to the atmosphere.
5. All piping is installed and supported. Direction of flow
is indicated in accordance with the installation instructions
and job prints.
a. Chilled water piping
b. Condenser water piping
c. Waterbox drain piping
d. Oil cooler water piping
e. Pumpout unit condenser water piping (if installed)
f. Other
6. Flow switches are installed on both cooler and
condenser water loops.
7. Gages are installed as called for on the job prints required
to establish design flow for the cooler and condenser.
a. Water pressure gages IN and OUT
8. The machine's starter wiring is complete. The wiring is
installed per installation instructions and certified prints.
a. Power wiring to compressor motor. (Motor leads will
not be taped until the Carrier technician megger tests
the motor.)
b. Oil pump wiring
c. Oil heater/control wiring
d. Flow switch wiring on cooler and condenser
e. Other
9. The motor starter has not been supplied by Carrier. It
has been installed according to the manufacturer's
instructions.
10. The motor starter has not been supplied by Carrier and it
has been checked for proper operation.
COMMENTS:

INSTALLATION START-UP REQUEST CHECKLIST

Serial Number:
Date
Project Name
Carrier Job Number
YES/NO
(N/A)
CL-1
DATE TO BE
COMPLETED

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hfc-134a

Table of Contents