Installation; Receiving The Machine; Inspect Shipment - Carrier 19FA Series Installation Instructions Manual

50/60 hz hermetic centrifugal liquid chillers hfc-134a
Hide thumbs Also See for 19FA Series:
Table of Contents

Advertisement

Receiving the Machine

Inspect Shipment

CAUTION
Do not open any valves or loosen any connections. The 19FA machine may be
shipped with the entire refrigerant charge in the storage tank and a small refrig-
erant holding charge in the cooler and condenser. Some machines may be
shipped with a nitrogen holding charge in the machine and the refrigerant
shipped separately.
1. Inspect for shipping damage while machine is still on shipping conveyance. If machine
appears to be damaged or has been torn loose from its anchorage, have it examined by
transportation inspectors before removal. Forward claim papers directly to transportation
company. Manufacturer is not responsible for any damage incurred in transit.
2. Check all items against shipping list. Immediately notify the nearest Carrier representative if
any item is missing.
3. To prevent loss or damage, leave all parts in original packages until beginning installation.
All openings are closed with covers or plugs to prevent dirt and debris from entering

Installation

!
CAUTION

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hfc-134a

Table of Contents