Carrier 19FA Series Installation Instructions Manual page 18

50/60 hz hermetic centrifugal liquid chillers hfc-134a
Hide thumbs Also See for 19FA Series:
Table of Contents

Advertisement

(38 mm) diameter holes located on the machine base assembly that provide for optional,
customer-supplied anchor bolts.
Springs are shipped separately on machines ordered with spring isolation. Specific details on
spring mounting and machine weight distribution should be obtained from your individual job
data.
At the time of installation, the 19FA machine has refrigerant in excess of 2000 lb (90 kg) in
the integral storage tank. This refrigerant is redistributed throughout the machine at initial start-
up. To avoid damage to machine and piping, spring isolators must remain blocked until machine
is started.
Click here for Figure 5 — Machine Footprint
Click here for Figure 6 — Machine Contact Surfaces with Anchor Bolts

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hfc-134a

Table of Contents