General
The 19FA machine is factory assembled, wired, and leak tested. Installation (not by Carrier)
consists primarily of establishing water and electrical services to the machine. The rigging,
installation, field wiring, field piping, and insulation are the responsibility of the contractor and/or
customer. Carrier has no installation responsibilities for the equipment.
Job Data
Necessary information consists of:
•
job contract or specifications
•
machine location prints
•
rigging information
•
piping prints and details
•
field wiring drawings
•
starter manufacturer's installation details
•
Carrier certified drawings
Introduction