Connect Control Inputs

Connect the control input wiring from the chilled and condenser water flow switches to the
starter terminal strip. Wiring may also be specified for a spare safety switch, and a remote
start/stop contact can be wired to the starter terminal strip. Additional spare sensors and
Carrier Comfort Network modules may be specified as well. These are wired to the machine
control center as indicated in

Connect Control Outputs

Connect auxiliary equipment, chilled and condenser water pumps, and spare alarms as
required and indicated on job wiring drawings.
Connect Free-Standing, Field Installed Starter
Assemble and install compressor terminal box in desired orientation, and cut necessary
conduit openings in conduit support plates. See
Attach power leads to compressor terminals in accordance with job wiring drawings, observing
caution label in terminal box. Use only copper conductors. The motor must be grounded in
accordance with NEC (National Electrical Code), applicable local codes, and job wiring
diagrams. Installer is responsible for any damage caused by improper wiring between starter
and compressor motor.
Figure 22
and
Figure
Figure
23.
15,
Figure
16,
Figure
17, and
Figure
24.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hfc-134a

Table of Contents