Lead-Lag Control Wiring; Install Field Insulation And Lagging - Carrier EVERGREEN HFC-134A Installation Instructions Manual

High-efficiency variable speed screw chiller with foxfire compression technology and pic iii controls 50/60 hz hfc-134a
Table of Contents

Advertisement

When connecting the CCN communication bus to a system
element, a color code system for the entire network is recom-
mended to simplify installation and checkout. See Table 14 for
the recommended color codes:
Table 14 — Insulator Codes
CCN BUS
CONDUCTOR
SIGNAL TYPE
INSULATION
COLOR
+
Ground
If a cable with a different color scheme is selected, a similar
color code should be adopted for the entire network.
NOTE: This color scheme does not apply to SIO wiring
between the CCM and Gateway module.
At each system element, the shields of its communication
bus cables must be tied together. If the communication bus is
entirely within one building, the resulting continuous shield
must be connected to ground at only one single point. See
Fig. 49. If the communication bus cable exits from one build-
ing and enters another, the shields must be connected to ground
at the lightening suppressor in each building where the cable
enters or exits the building (one point only).
To connect the 23XRV chiller to the network, proceed as
follows (see Fig. 49):
1. Route wire through knockout in back of control panel.
2. Strip back leads.
3. Crimp one no. 8 size spring spade terminal on each
conductor.
CCN NETWORK
INTERFACE
(Control Panel)
Red
+
White
G
Black
4. Attach red to "+" terminal and white to "G" terminal and
black to "–" terminal of CCN Network interface located
in the control panel.
Lead-Lag Control Wiring —
wired for lead-lag operation in either series or parallel. See
Fig. 53 for applicable wiring schematics.

Install Field Insulation and Lagging

Protect insulation from weld heat damage and weld splat-
ter. Cover with wet canvas cover during water piping
installation.
When installing insulation at the job site, insulate the fol-
lowing components:
• compressor
• discharge pipe assembly
• cooler shell
• cooler tube sheets
• condenser shell
• condenser tubesheets
• suction piping
• economizer
• economizer muffler
• motor cooling drain
• oil reclaim piping
• vaporizer chamber
• refrigerant liquid line to cooler
NOTE: Insulation of the waterbox covers is applied only at the
job site by the contractor. When insulating the covers, make
sure there is access for removal of waterbox covers for servic-
ing (Fig. 54).
44
The 23XRV can be

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Evergreen 23xrvEvergreen 23xrv series

Table of Contents