Yamaha TZR50 '03 Service Manual page 120

Table of Contents

Advertisement

ASSEMBLING AND ADJUSTING THE ENGINE
2. Install:
• Drive chain
NOTE:
After installing the drive chain adjust the ten-
sion of the chain. See "ADJUSTING CHAIN" in
Chapter 6.
3. Install:
• Crankcase cover 2 (left)
Screws for securing crankcase
cover 2
0.5 m • kg
• Output gear cover
Screws for securing output gear
cover
0.5 m • kg
• Shift cam
Shift cam screw.
0.6 m • kg
4. Install:
• Oil pump cover
Pump cover securing screw:
0.4 m • kg
• Spark plug
Spark plug:
2.0 m • kg
• Exhaust pipe
Screws for securing the exhaust
pipe to the chassis:
2.1 m • kg
• Springs
• AIS pipe
Screw for the clamp of the AIS
tube:
0. 4 m • kg
5. Add:
• Transmission oil
• Coolant
Transmission oil:
total: 0.82 L
Total amount of coolant:
0.7 L
4-41
ENG
3.0 m • kg

Advertisement

Table of Contents
loading

This manual is also suitable for:

X-power '03 5wx-ae12003 tzr502003 x-power

Table of Contents