Rack Setup For The Ebm - Eaton BladeUPS User Manual

12 kva
Hide thumbs Also See for BladeUPS:
Table of Contents

Advertisement

Rack Setup for the EBM

The EBM is heavy (see page 114). A minimum of two people are required to remove the EBM
from its carton.
NOTE Mounting rails are required for each individual cabinet.
To install the EBM rail kit:
1.
Loosen the assembly wing nuts on both rail assemblies and adjust
the rail size for the depth of your rack (see Figure 9).
Front
Rail Assembly
2.
Select the proper holes in the rail for positioning the EBM and other
cabinets in the rack.
Place the first rail for the first EBM at the bottom, using positions 1
and 6 for the front hex−head screws. If you are installing additional
rails, place the next rail 4 holes above the last installed screw (see
Figure 10).
NOTE Verify that the hole patterns on the rails and mounting brackets align with the hole
pattern on the rack.
EATON Powerware
®
BladeUPSt (12 kVA) User's Guide
C A U T I O N
Assembly Wing Nuts
Figure 9. Adjusting the Rail Depth
S
164201649 Rev 3 www.powerware.com
INSTALLATION
Rear
29

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powerware bladeups

Table of Contents