Power down the server (on page 17).
2.
Remove all power:
3.
Disconnect each power cord from the power source.
a.
Disconnect each power cord from the server.
b.
Extend the server from the rack (on page 17).
4.
Remove the access panel (on page 19).
5.
Remove the processor air baffle (on page 19).
6.
Disconnect external cables connected to any existing expansion boards.
7.
Remove the PCI riser cage:
8.
Unfasten the three screws in the PCI riser cage.
a.
To unseat the PCI riser boards, lift the assembly, and then remove the cage.
b.
Install the PCI riser cage
CAUTION:
remove all AC power cords before removing or installing the PCI riser cage.
Align the PCI riser boards with the corresponding connectors on the system board, and then insert the
1.
cage.
To prevent damage to the server or expansion boards, power down the server and
Operations 21