FBWC cache module
o
Install the PCI riser cage (on page 21).
13.
Install the processor air baffle.
14.
Install the access panel.
15.
Slide the server into the rack.
16.
Connect each power cord to the server.
17.
Connect each power cord to the power source.
18.
Power up the server.
19.
If removed, install the rack bezel (on page 60).
20.
Installing the front video adapter cable
Depending on the model purchased, the server may look different than shown.
To install the component:
Connect the front video adapter to the front video connector.
1.
CAUTION:
connector.
("Install the processor air
("Install the access
("Power up the
server" on page 17)
Be sure to connect the video adapter to the video connector, and not to the USB
baffle" on page 20)
panel" on page 19)
Hardware options installation 53