Concluding Steps - Fujitsu PRIMERGY CX272 S1 Upgrade And Maintenance Manual

Server node
Hide thumbs Also See for PRIMERGY CX272 S1:
Table of Contents

Advertisement

9.3.3

Concluding steps

Perform the following steps:
"Installing the riser module" on page 70
Ê
applicable)
I
Install the expansion cards into their original slots.
"Installing the memory slot air ducts" on page 45
Ê
"Installing the air duct brackets" on page 47
Ê
"Installing the air duct" on page 49
Ê
"Installing the air duct" on page 49
Ê
"Installing the server node in the Dual Node Cluster Server" on page 72
Ê
Ê If applicable, reconnect all external cables.
"Switching on the server node" on page 73
Ê
"Updating or recovering the system board BIOS and BMC" on page 77
Ê
applicable)
"Verifying the system time settings" on page
Ê
Ê Inform the customer about changed WWN and MAC addresses. For further
information, refer to section
on page
90.
Ê After replacing the system board in a server running Linux OS, update the
MAC address of the onboard network controller in the related NIC definition
file as described in section
environment" on page
"Enabling boot watchdog functionality" on page 84
Ê
Ê If applicable, restore LAN teaming configurations as described in section
"After replacing the system board" on page
CX272 S1
"Looking up changed MAC / WWN addresses"
"Updating the NIC configuration file in a Linux
88.
Upgrade and Maintenance Manual
System board and components
with expansion all cards (if
86.
92.
(if
219

Advertisement

Table of Contents
loading

Table of Contents