Concluding Steps - Fujitsu PRIMERGY CX272 S1 Upgrade And Maintenance Manual

Server node
Hide thumbs Also See for PRIMERGY CX272 S1:
Table of Contents

Advertisement

Expansion cards
6.3.3.4

Concluding steps

Perform the following steps:
"Installing SAS RAID controller" on page 124
Ê
Ê Installing the 3-pin cable onboard.
"Installing the riser module" on page 70
Ê
"Installing the server node in the Dual Node Cluster Server" on page 72
Ê
Ê Reconnect all external cables.
"Switching on the server node" on page 73
Ê
"Updating RAID controller firmware" on page 83
Ê
"Enabling boot watchdog functionality" on page 84
Ê
"After replacing / upgrading LAN controllers" on page 92
Ê
"Updating the NIC configuration file in a Linux environment" on page 88
Ê
"Looking up changed MAC / WWN addresses" on page 90
Ê
122
Upgrade and Maintenance Manual
(if applicable)
(if applicable)
(if applicable)
CX272 S1

Advertisement

Table of Contents
loading

Table of Contents