Main memory
7.2
Installing memory modules
Upgrade and Repair Unit
(URU)
Tools: Phillips PH2 / (+) No. 2 screw driver (preliminary and concluding
steps), tool-less
7.2.1
Preliminary steps
Perform the following steps:
"Disabling SVOM boot watchdog functionality" on page 75
Ê
Ê Locate the desired server node.
"Shutting down the server node" on page 41
Ê
Ê If applicable, remove all external cables from the server node.
"Removing the server node from the Dual Node Cluster Server" on page 42
Ê
"Removing the air duct" on page 44
Ê
"Removing the air duct brackets" on page 43
Ê
"Removing the memory slot air ducts" on page 44
Ê
Ê Identify the correct memory slot according to the mounting order described
in section
"Memory sequence" on page
148
Upgrade and Maintenance Manual
Hardware: 5 minutes
142.
CX272 S1