NEC Express5800/R120b-2 User Manual page 356

Hide thumbs Also See for Express5800/R120b-2:
Table of Contents

Advertisement

9-24 Upgrading Your Server
7.
Install the new power supply unit taking steps 3 to 7 of "Installation", and confirm that the
power supply unit is installed normally.
NOTE:
the AC POWER LED of the new power supply unit goes on amber until
the AC power cord is connected. It turns on green when the AC power
cord is connected. (If it is replaced while the power is off, the LED
flashes green. The LED goes on green when the power is turned on.)
If one of the two power supply units of the server is replaced,

Advertisement

Table of Contents
loading

Table of Contents