Installation & Verifying; Check When You First Open The Box; Preparation Before Installation; Installation - Raisecom RC3000 PCM User Manual

Pcm multi-service multiplexer
Table of Contents

Advertisement

8.1. Check when you first open the box

Check whether the type of device, spare parts and number are same with that of packing
list. Make sure the device appearance is in excellent condition. There must be drying
process if the device has been damp.

8.2. Preparation before installation

a. Read this manual carefully
b. Verify all the cables are good for normal use. (Please refer to relative chapter for the
connection method of cables).
c. Make sure that the voltage of power supply is within the range and grounding
protection.
d. Make ready of bit error rate test and optical power meter for necessary line tests.
e. For the devices to be installed, please consider their positions and the length of cables.
We recommend you have a whole topology first.

8.3. Installation

8.3.1. Device fixing:

RC3000 can be installed in the chassis or on cabinet. Please make sure that the
installation is firm and convenience for operation.

8.3.2. Cabble connection

a. Connect the power supply and ground:
There are both AC power supply and DC power supply of RC3000, no matter which
kind of power supply make sure of good grounding protection. And the chassis
grounding of RC3000 must be connected to that of other device and the earth.
Otherwise the device may not work normally.
b. E1 signal interface:
The E1interfaces of RC3000-2E1 are CC3 interfaces, and the E1interfaces of
RC3000-4E1 are balanced RJ45 interfaces. Please use the affixing cables we
8. Installation & verifying
Raisecom Technology Co., Ltd
47

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rc3000

Table of Contents