HANDLE COVER, METER ASSEMBLY AND LEGSHIELD
Order
Job name/Part name
Handle cover, meter assembly and
legshield removal
1
Handle cover
2
Coupler (meter lead)
3
Meter cable
4
Meter assembly
5
Main switch cover
6
Cover
7
Legshield
COVER AND PANEL
Q'ty
Remove the parts in order.
NOTE:
1
1
Disconnect the couplers.
1
2
1
2
1
Reverse the removal procedure for
installation.
3-8
INSP
ADJ
Remarks