Hach sc1000 User Manual page 23

Hach controller user manual
Hide thumbs Also See for sc1000:
Table of Contents

Advertisement

6. Strip the cable outer insulation 260 mm (10 in.)
7. Feed the stripped power cable through the ferrite core twice
8. Seal any unused openings in the controller box with conduit opening sealing plugs.
9. Install the high voltage barrier.
10. Connect the chassis ground connection to the ground stud of the probe module
11. Install the probe module cover and screw into place.
1
Power cable wire preparation
2
Ferrite core
Terminal number
L
N
the earth wire 20 mm (0.78 in.), so the earth cable is 20 mm (0.78 in.) longer than the
other cables.
the terminal as shown in
make sure that the connection is secure.
cover.
Figure 12 Proper wire preparation and ferrite core wiring
Table 1 AC power wiring information
Terminal description
Hot (L1)
Neutral (N)
Protective Earth (PE)
(Figure
Table 1
and
Figure
10. Tug gently after each insertion to
3
Power cable wires
4
Power cables wrapped around ferrite core
Wire color code for North
America
Black
White
Green
Installation
12). Shorten all wires except
(Figure
12) and wire into
Wire color code for Europe
Brown
Blue
Green w/yellow tracer
21

Advertisement

Table of Contents
loading

Table of Contents