Installing The Ups - Eaton 5125 User Manual

Tower ups 1000–2200 va
Hide thumbs Also See for 5125:
Table of Contents

Advertisement

INSTALLATION

Installing the UPS

22
Eaton 5125 Tower UPS (1000–2200 VA) User's Guide
NOTE Do not make unauthorized changes to the UPS or accessories; otherwise, damage
may occur to your equipment and void your warranty.
Figure 6 shows a typical installation only. See "UPS Rear Panels" on
page 24 for the rear panel of each model.
To install the UPS and optional Extended Battery Modules (EBMs):
1.
If installing an optional EBM, continue to Step 2; otherwise,
proceed to Step 3.
2.
Plug the EBM cable(s) into the battery connector(s) as shown in
Figure 6. Up to four EBMs may be connected to the UPS.
Communication Port
UPS Battery
Connector
Power Cord
Figure 6. Typical UPS Installation with Two EBMs
3.
If you plan to install power management software, connect your
computer to the UPS communication port using the supplied
communication cable. For more information about communication
options, see page 35.
EBM Battery Connector
UPS
EBM
Output Receptacles
S
05147304 Rev C www.eaton.com/powerquality
EBM Cable
EBM

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents