Connecting To The Customer's Network; Installing And Wiring Telephones; Completing The Installation; Testing The Complete Installation - Avaya G650 Installing

Media gateway
Hide thumbs Also See for G650:
Table of Contents

Advertisement

Connecting to the customer's network

You can perform this stage anytime. But to allow testing along the way, connect to the customer
network after you cable the media gateways and connect the gateways to the media server
complex.

Installing and wiring telephones

In this stage, you wire, place, and test the telephones. In most cases, the configuration must be
operational and responsive before you can perform this stage. An exception exists for IP
telephones that are connected to the network, which you can place before you complete the
installation. When you install wiring for traditional telephones and analog or digital consoles,
ensure that you install the telephones when you can also test the telephones.
Note:
The information for this stage is provided in the document, Installing and
Note:
Connecting Main Distribution Frames and Telephones, (03-300686).

Completing the installation

In this stage, you finish the installation. To finish the installation, you clear alarms, enable alarm
reporting, back up the servers, connect the modems and register the configuration. This stage
comes at the end of the actual installation.

Testing the complete installation

In this stage, you verify the complete configuration operation. Always perform this stage last.
High-level overview of the installation process
Issue 1 February 2006
19