The followings are instructions for setting up the UMG-2000. Refer to the illustration and
follow the steps install your unified office gateway.

2.1 Hardware Installaion

2.1.1 Unpack the UMG-2000

Note:
You should inspect the box which the system was shipped in and note if it was damaged in any way
before the unpacking. If the UMG-2000 itself shows damage you should file a damage claim with
the carrier to who delivered it. Unpack the UMG-2000 as listed below.

2.1.2 Choosing a Setup Location

Decide on a suitable location for the UMG-2000 which should be situated in a clean,
dust-free, and well ventilated area. Avoid areas where heat, electrical noise and
electromagnetic fields are generated. Place the UMG-2000 near a grounded power outlet
and pay attention to the following requirements.
Leave approximately 40cm (16inche) of clearance in front of the UMG-2000 to
ensure the disk carriers can be unplugged.
Leave approximately 30cm (12 inch) of clearance in the back of the UMG-2000 to
allow for sufficient airflow and ease in servicing.