Installation Flowchart
Preparation at
location of installation
Unpacking
Check of supplied accessories
System connections
Turn on the power to the system
and perform initialization
Other setup, if needed
Are/Is the firmware
update and/or the optional
software installation
performed?
Yes
. Firmware update
. Optional software installation
Operation test and confirmation
Turn off the system
End
1-2
<Refer to "1-1. Layout information for PCS-XG Series models">
<Refer to "1-1-1. Simple Connection">
<Refer to "3-8. Replacing the Batteries">
<Refer to "1-2. System Connections">
<Refer to "2-1-1. Turning On the System">
<Refer to "2-2-1. Setup of Your First Time Power-On">
<Refer to "2-2-2. Other Setup">
No
<Refer to "3-1. Firmware Update">
<Refer to "3-2. Optional Software Installation">
<Refer to "2-1-2. Turning Off the System">
PCS-XG80