Fujitsu ETERNUS LT20 S2 Installing, Starting Up And Maintaining page 32

Lto library
Hide thumbs Also See for ETERNUS LT20 S2:
Table of Contents

Advertisement

Connecting
3. Attach the other end of the signal cable
– in a SAS configuration to the SAS HBA or a SAS expander.
– in a Fibre Channel configuration to the FC HBA, an FC hub, an FC device
with two I/O ports or an FC switch.
4. Attach the power cable to the power connector on the back panel of the
library (see figure 19).
Figure 19: Attaching the power cord
V
CAUTION
To disconnect all power from the library, remove the power cord from
the outlet. The power button only puts the power on stand-by.
5. Plug the power cable into the nearest properly grounded power outlet.
6. Turn on the library using the power button. Check the LCD screen to make
sure the library is receiving power. If it is not, check the power connections
and your power source. During the Power-On-Self-Test (POST), all four
LEDs are illuminated briefly, followed by a flashing Ready LED. When the
initialization sequence is complete, the Home screen will be displayed.
7. Plug in the host server or workstation and all attached devices.
8. Turn on any other devices you turned off earlier.
9. Turn on the server.
32
Installing the Tape Library
ETERNUS LT20 S2

Advertisement

Table of Contents
loading

Table of Contents