Fujitsu ETERNUS LT20 S2 Installing, Starting Up And Maintaining page 15

Lto library
Hide thumbs Also See for ETERNUS LT20 S2:
Table of Contents

Advertisement

Product Description
No.
Description
1
Power connector: The library requires a 110/220 volt AC power
connection
2
Shipping lock (storage location)
3
Fan vent
4
Tape drive sled
6
Product label foil (see
page
105)
7
Tape Drive LED
8
Ethernet port
9
Serial port
10
Controller LED
11
USB port (Host)
12
SAS connector
13
Fibre Channel connector
ETERNUS LT20 S2
chapter "Packaging before Transportation" on
Rear Panel
15

Advertisement

Table of Contents
loading

Table of Contents