Remove the heat sinks and processors by following the instructions in
a processor" on page
7
Disconnect all cables from the system board, noting their locations and orientation. (You
will reconnect the cables after you install the new board.)
8
Loosen the two thumbscrews (1) that secure the system board to the server.
2
2
1
9
Slide the system board toward the back of the server until it is free of the eight retaining
standoffs (2), then lift the board from the chassis.
10
Place the old system board in a static-free bag for storage.
11
Insert the new system board into the chassis, aligned with the eight retaining standoffs,
then slide the board toward the front of the case so the board is held by the standoffs.
12
Tighten the two system board thumbscrews you loosened in
13
Connect the cables you removed in
14
Install the memory by following the instructions in
15
Install the processor and heatsink by following the instructions in
processor" on page
www.gateway.com
43.
2
2
2
Step 7
43.
"Replacing or adding
Step
8.
"Installing memory" on page
"Replacing or adding a
2
2
36.
55

Advertisement

Table of Contents
loading

Table of Contents

Save Article as PDF