Chapter 3 Operation; General - Vaisala RS92-SGP User Manual

Radiosonde
Hide thumbs Also See for RS92-SGP:
Table of Contents

Advertisement

Chapter 3 ________________________________________________________________ Operation
CHAPTER 3
OPERATION

General

VAISALA _______________________________________________________________________ 15
This chapter contains information that is needed to operate this product.
It is essential that you carry out the pre-launch steps as instructed and
always in the same way. Follow the instructions in the sections below
and refer to
Appendix A on page 51
preparation.
The workorder for a sounding is as follows:
1.
Prepare the balloon and optional sounding accessories.
2.
Unpack the radiosonde.
3.
Prepare the sounding.
4.
Connect the battery.
5.
Launch the radiosonde.
6.
Monitor the sounding with the sounding system.
When conducting additional sensor soundings (ozone or radioactivity
soundings), follow the procedures and guidelines in the relevant User's
Guides.
for proper and safe balloon

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents