Inspection And Maintenance 9; Notes For Maintenance; Carrying Out Maintenance Work; Test Operation And Restarting - Vaillant geoTHERM VWS Installation Instructions Manual

Hide thumbs Also See for geoTHERM VWS:
Table of Contents

Advertisement

9
Inspection and maintenance
9.1

Notes for maintenance

An annual inspection/maintenance of the unit by a spe-
cialist is a prerequisite for continuing operational safety,
reliability and a long working life.
d
Danger!
Inspection, maintenance and repair work
should only be undertaken by an appro-
ved heating installation company.
Inspections / Maintenance work not car-
ried out can result in damage to proper-
ty and personal injury.
e
Danger!
Risk of fatal electric shock from tou-
ching live connections! Before commen-
cing work on the heat pump, disconnect
the power supply (circuit breaker) and
secure it against being switched on
again inadvertently.
Only genuine Vaillant spare parts may be used for in-
spections, maintenance and repair work to ensure the
long-term availability of all functions of your Vaillant ap-
pliance and to prevent the approved series condition
from being changed.
Any spare parts which might be required are listed in
the relevant current spare parts catalogues.
Information can be obtained from Vaillant Customer
Service Centres.
Installation instructions geoTHERM VWS 0020046310_01

Inspection and maintenance 9

9.2

Carrying out maintenance work

e
Danger!
Risk of fatal electric shock from tou-
ching live connections! Before commen-
cing work on the heat pump, disconnect
the power supply (circuit breaker) and
secure it against being switched on
again inadvertently.
The heat pump is engineered in such a way that only a
few maintenance tasks need to be carried out:
– Manually actuate the safety assemblies in the brine
and heating circuits at regular intervals.
– Check the dirt filter in the brine circuit regularly.
– Check the pressures in the brine and heating circuits
regularly.
d
Danger!
Risk of injury!
The heat pump may only be put into ope-
ration again after all the cladding sec-
tions have been fitted.
9.4

Test operation and restarting

d
Danger!
Risk of injury!
The heat pump may only be put into ope-
ration again after all the cladding sec-
tions have been fitted.
• Fit all the heat pump cladding sections as described in
Chap. 6.4.
• Start up the heat pump.
• Check the heat pump for correct functioning.
69

Advertisement

Table of Contents
loading

Table of Contents