7 Start-up
• Turn the
dial until the electroplan, "1", "2" or "3",
matching your mains supply is selected (see
Chap. 6.4):
1 Unblocked mains supply
2 = Dual circuit feed, heat pump tariff
3 = Dual circuit feed, special tariff
• Press the
dial to confirm the selection.
Adopting the settings
• Turn the
dial until the cursor > on the right of the
"accept" menu entry points to NO.
• Press the
dial. The parameter will be activated and
displayed in inverse video.
• Turn the
dial until "YES" appears.
• Press the
dial to confirm the selection.
h
Note!
A complete description of the displays
(Menus A1 to A9) for the initial commis-
sioning can be found in Table 8.4
• Make all the necessary settings and continue with the
Installation Assistant to the end.
Installation completed
Exit mode?
>Settable values
Fig. 7.5 Menu A9: Ending the installation
• Only set "Exit mode? "to "YES" if you are sure that
everything has been set correctly.
Once you have confirmed with "YES", the controller
switches to the graphics display. The heat pump starts
under its autonomous control system.
44
7.4
To bleed the brine circuit, activate the "Brine bleeding"
menu point in Menu A7. The brine pump now alternates
between 50 minutes operation and 10 minutes standstill.
Check whether the fluid level in the brine expansion
tank has stabilised.
• Let the brine pump continue to run, so that the air
trapped in the system can be collected in the expansi-
on tank. The level of the fluid in the expansion tank
falls as a result of the discharge of air and must be
topped up again as described in Chap. 5.2.
• Open the expansion relief valve to allow any possible
overpressure to discharge. The tank must be filled to
2/3 full with fluid.
7.5
• If manual switching of the heating circuit pump and
the 3-way valve is necessary to bleed the heating cir-
cuit, perform this via Menu A5/A6 (see Table 8.4).
7.6
• Instruct the operator of the system in the handling
and function of all the equipment.
• Hand over all the instruction manuals and documents
for the appliance to the operator for safe keeping.
• Tell the operator to keep the manuals nearby the con-
troller. Inform the owner of the need for regular in-
A9
spection of the system.
>yes

Bleeding the brine circuit.

Bleeding the heating circuit

Handing the system over to the operator