Preparing The Machine; Installation; Unpacking Of The Unit; Connection Of The Machine - Avery Dennison ALS 330/430 User Manual

Avery dennison label maker user manual
Table of Contents

Advertisement

Operators Manual
ALS 330/430

3. Preparing the machine

In this chapter you will learn how to install and adjust the labeller. After this step has been
completed you will be ready to learn how the labeller's parameters can be adjusted to suit your
particular production requirements.

3.1 Installation

3.1.1

Unpacking of the unit

For removing the unit off the box, don't hold the machine on the dispensing edge to prevent
disadjustment off the machine.
For mounting the machine, a complete system of holding tools is available. Ask your
representative.
Take care that the machine is safe and stable mounted.
There are rotating parts on the machine. Do the necessary actions to prevent that anybody
can be caught from these parts.
3.1.2

Connection of the machine

Before connecting the machine to the mains, check the correct setting of the line voltage. For
the connection of sensor, applicators e.g. see the chapter connections. Fix all cables to prevent
accidents and damaging of cables. Have also a look to the EMI chapter for proper machine
operation.
For checking of correct operation of sensors, applicators use the check functions SCHK, I_CH
and O_CH.
3.1.3

General setting

Normally the setting is done, but before operation check and note the general dispenser
configuration: dispenser direction, machine type, applicator mode, and APSF function.

3.2 Prepare dispensing

3.2.1

Insert material

Insert your label material in the machine to follow the instructions in the chapter Operation /
Threading.
Release 4/06
Page 17
Preparing the machine

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Als 330Als 430

Table of Contents