Introduction
The first active IP DECT base station will be chosen by the ADMM as the Master for the
synchronisation. If a specific IP DECT base station shall be used, for example to speed-up the
synchronisation phase, then a IP DECT base station can be marked with 'Act as Master during
startup' on the IP DECT base station Web page.
Unsynchronised RFP,
which does not receive a
R 101
signal from another RFP
Unsynchronised RFP,
which receives a signal
from another RFP and
tries to get synchronised
Synchronised RFP,
which receives and
transmits a signal on the
air interface
As long as a IP DECT base station is not in synch, no calls can be established using this IP
DECT base station.
If a IP DECT base station loses the synchronisation the IP DECT base station does not accept
new calls ("Busy-Bit"). There is a delay of max. 3 minutes until the active calls on this IP DECT
base station are finished. Then it tries to get synchronised again.
18 Avaya IP DECT Installation, Administration, and Maintenance
R 102
R 111
R 110
R 109
R 103
R 104
R 107
R 108
R 105
R 106