Exercise 9
Define test setup and perform test.
1. Click C-V Sweep icon and open setup editor.
2. Define test setup as shown in page 5-36 to 5-42. And
save it as Trng CV.
3. Open measurement terminals, and perform phase
compensation and open correction.
4. Connect device, and perform test.
5. Export preset group, and import it.
Time to complete: 10 minutes.
Note:
CMH
5-45
SMU1
CML
SMU3