Fujitsu Eternus DX80 S2 User Manual page 36

Disk storage system
Hide thumbs Also See for Eternus DX80 S2:
Table of Contents

Advertisement

Chapter 2 Basic Operation
2.1 Powering On and Off
IMPORTANT
The procedure below explains how to turn on the power via the Power switch.
For details on how to turn on the power via the Wake On LAN function, refer to the manual of the
software to be used for the Wake On LAN function.
Procedure
1
ETERNUS DX80 S2/DX90 S2 Disk storage system User's Guide -Operation-
After turning the power on, it takes about two minutes for the ETERNUS
DX Disk storage system to become READY (i.e. the READY LED turns
on). If an error is detected during the initial power-on diagnostic phase,
a longer time (up to ten minutes) may be required before the READY
LED turns on.
Before turning the server on, check that the ETERNUS DX Disk storage
system and the network devices that connect the ETERNUS DX Disk
storage system and the server are all in READY status. If the server is
turned on while any of these devices are not in READY status, the
server may not be able to recognize the ETERNUS DX Disk storage
system.
If the Auto Power function is enabled via ETERNUS Web GUI or
ETERNUS CLI, the ETERNUS DX Disk storage system is automatically
turned on when power is supplied to the ETERNUS DX Disk storage
system.
If the Power Resume function is enabled via ETERNUS Web GUI or
ETERNUS CLI, the ETERNUS DX Disk storage system is automatically
turned on after the power is restored.
Before turning on the ETERNUS DX Disk storage system, check that the
LINE LEDs of the drive enclosures are green.
Press the Power switch of the controller enclosure.
Power switch
The POWER LEDs on the controller enclosure and the drive enclosures are turned on.
Copyright 2011 FUJITSU LIMITED
Drive enclosure
Drive enclosure
Controller enclosure
36
P3AM-4842-01ENZ0

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eternus dx90 s2

Table of Contents