Installing The Summit Option Card - Extreme Networks e” series Hardware Installation Manual

Table of Contents

Advertisement

Installing the Summit Option Card and XENPAK Modules
Table 135: ZR XENPAK Combinations
Left Slot
Right Slot
ZR XENPAK
SR XENPAK
This appendix provides instructions to install the option card and the uplink module.
NOTE
The Summit XGM-2xn Option Card requires ExtremeWare 7.4 or later. Be sure to upgrade your Summit
switch to ExtremeWare 7.4 (or later) before you install a Summit XGM-2xn Option Card. Installing a
XGM-2xn Option Card without the correct supporting software might prevent the switch from booting.

Installing the Summit Option Card

CAUTION
The Summit option card cannot be hot-swapped. Before installing the Summit option card in the Summit
400-48t switch, you must turn off the switch. Use only XENPAK modules approved by Extreme
Networks.
To install the Summit option card:
1 If you are installing a Summit XGM-2xn Option Card, upgrade the software in your switch to
ExtremeWare 7.4 (or later).
2 Disconnect the AC power from the Summit switch.
3 Using a number 1 Phillips screwdriver, remove the filler panel from the option slot on the back of
the switch (Figure 182). Save the screws for re-use.
Figure 182: Removing the option slot filler panel
Filler Panel
4 Align the edges of the sheet metal with the card guides, and carefully slide the option card into the
switch housing until the connectors engage and the option card is flush with the back panel of the
switch (Figure 183).
378
ES4K041
Extreme Networks Consolidated "e" and "i" Series Hardware Installation Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

I series

Table of Contents