Installing The Summit Option Card - Extreme Networks Summit 300-24 Hardware Installation Manual

Summit 200 e, 300 e, 400 e, i series
Hide thumbs Also See for Summit 300-24:
Table of Contents

Advertisement

Installing the Summit Option Card and XENPAK Modules

Installing the Summit Option Card

CAUTION
The Summit option card cannot be hot-swapped. Before installing the Summit option card in the Summit
400-48t switch, you must turn off the switch. Use only XENPAK modules approved by Extreme
Networks.
To install the Summit option card:
1 If you are installing a Summit XGM-2xn Option Card, upgrade the software in your switch to
ExtremeWare 7.4 (or later).
2 Disconnect the AC power from the Summit switch.
3 Using a number 1 Phillips screwdriver, remove the filler panel from the option slot on the back of
the switch (Figure 181). Save the screws for re-use.
Figure 181: Removing the option slot filler panel
Filler Panel
4 Align the edges of the sheet metal with the card guides, and carefully slide the option card into the
switch housing until the connectors engage and the option card is flush with the back panel of the
switch (Figure 182).
Figure 182: Installing the Summit XGM-2xn option card
Summit Option
Card
5 Using the screws from the cover plate, secure the option card to the back panel of the switch.
370
ES4K041
ES4K042
Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents