Troubleshooting The Power Subsystem - Cisco SCE 1000 Installation And Configuration Manual

Hide thumbs Also See for SCE 1000:
Table of Contents

Advertisement

Chapter 8
Troubleshooting

Troubleshooting the Power Subsystem

Check the following to help isolate a problem in the power subsystem. In the normally configured
SCE 1000 platform with redundant power supply units, it is unlikely that the device will not start
at all. However, at startup it should be verified that both power supply units are operational, and
therefore the following steps should be followed if one of the Power LEDs on the front panel
remains unlit when the SCE 1000 platform is powered up.
If the system powers off due to an environmental shutdown, wait at least one minute before manually
Note
rebooting the system, or it will pause indefinitely.
Table 8-3
Symptom
Power LED on the front
panel and LEDs on the
power supply unit are not
lit, or do not remain lit
continuously.
OL-7821-04
When all LEDs come on to indicate that the system has booted successfully, the initial system
banner should be displayed on the console screen. If it is not displayed, see
Local Console
(on page 5-1) to verify that the terminal is set correctly and that it is properly
connected to the console port.
If the banner is displayed, but the Status LED is flashing orange, indicating a warning state,
check the user log:
At the prompt, type: more user log
If any of the following warning messages appear, turn the SCE 1000 platform off and call
technical support.
"voltage problem:"
"fans problem"
"abnormal raise in interior temperature:"
If the following warning message appears, delete unneeded files from the disk.
"insufficient disk space:"
Troubleshooting the Power Subsystem
Possible Cause
Power cable not fully seated at system.
Power cable not fully seated at source.
Power source is faulty.
Faulty power cable.
Problem Solving Using a Subsystems Approach
Possible Solution
Turn the power switch to the off position and
reseat the power cable in the system.
Turn the switch to the off position and reseat
the power cable at the power source.
Turn the switch to the off position, connect the
power cable to another power source, if
available, and turn the switch back on.
Turn the switch to the off position, remove the
cable and replace it.
Cisco SCE 1000 2xGBE Installation and Configuration Guide
Connecting the
8-9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sce 1000 2xgbe

Table of Contents