Rack-Mounting A Sce 1000 Platform - Cisco SCE 1000 Installation And Configuration Manual

Hide thumbs Also See for SCE 1000:
Table of Contents

Advertisement

Installing the SCE 1000 Platform
Step 3
View the bottom panel by lifting the SCE 1000, placing your hands around the SCE 1000 sides
and lifting the SCE 1000 from underneath. To prevent injury, avoid sudden twists or moves.
There are four marked locations, indicating where to affix the rubber feet (see figure above).
Attach the rubber feet by removing the adhesive strips and affix the rubber feet onto the marked
Step 4
locations (on the bottom panel).
Replace the SCE 1000 platform firmly on the tabletop or workbench.
Step 5
Remember to check for proper ventilation. Allow at least 2 inches (5 cm) on each side for proper
ventilation and 5 inches (12.7 cm) at the back for ventilation.and power cord clearance.
This completes the general workbench or tabletop installation.
Proceed to section,
installation.

Rack-Mounting a SCE 1000 Platform

You can mount the SCE 1000 platform to a 19" rack. There are two standard types of equipment
racks, and the appropriate brackets for each are provided in the enclosed kit.
The SCE 1000 mounts to the two front rack posts with brackets that attach to the front of the SCE
1000 The inside width between the two posts or mounting strips (left and right) must be at least
17.3 inches (44 cm).
Remember to leave a two-inch (5 cm) clearance on both sides of the SCE 1000 and at the rear for
Note
adequate airflow for the inlet and exhaust vents.
Because the inlet and exhaust ports (vents) for cooling air are located at both sides of the chassis,
respectively, multiple SCE 1000s can be stacked in a rack with no vertical clearance.
Cisco SCE 1000 2xGBE Installation and Configuration Guide
4-6
Attaching a Chassis Ground Connection
19" rack with front rack posts — the mounting kit includes two mounting brackets as
illustrated below.
19" rack with front and back rack posts — in addition to the mounting brackets illustrated
below, the mounting kit includes two crossrail supports that the unit slides onto.
Mounting Brackets for 2-post Rack
Chapter 4
Installation and Maintenance
(on page 4-10) to continue the
Mounting Brackets for 4-post Rack
OL-7821-04

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sce 1000 2xgbe

Table of Contents