Cisco SCE 1000 Installation And Configuration Manual page 25

Hide thumbs Also See for SCE 1000:
Table of Contents

Advertisement

Chapter 2
Introduction to the SCE Platform
Table 2-3
LED Groups
Power A
Power B
Status
Bypass
GBE ports
OL-7821-04
SCE 1000 LED Groups
Description
• Continuous green — Power supply A is functioning normally
• Red — Power supply A present, but malfunctioning
• Unlit — Power supply A is either not present or has failed.
• Continuous green — Power supply B is functioning normally
• Red — Power supply B present, but malfunctioning
• Unlit — Power supply B is either not present or has failed.
The Status LED indicates the operational status of the SCE 1000 system, as
follows:
• Unlit — indicates no power from either power unit.
• Orange — indicates that the system is booting up.
• Flashing green — indicates that the system is fully operational.
• Flashing orange — indicates that the system is operational, but is in a warning
state.
• Red — indicates that there is a problem or failure
Note that Alarms are hierarchical: Failure takes precedence over Warning, which
takes precedence over operational.
• Continuous green — indicates that the traffic bypasses the SCE 1000 through
an internal electrical bypass module.
Single SCE 1000 topology — The SCE 1000 is either in bypass or sniffing
mode
Cascaded topology — Either the SCE 1000 is forwarding traffic to the other
SCE 1000, where it is being processed, or is simply in bypass mode, so traffic
through it is not being processed.
• Unlit — traffic is not being bypassed
Single SCE 1000 topology — indicates normal operation of the SCE 1000
Cascaded topology — indicates normal operation of the active SCE 1000
The GBE LEDs indicate the operational status of the SCE 1000 line ports, as
follows:
• Link
Green — indicates that the port link is up
Unlit — indicates that the port link is down
• Rx
Flashing Green — indicates that there are incoming packets
• Tx
Flashing Green — indicates that there are outgoing packets
Cisco SCE 1000 2xGBE Installation and Configuration Guide
Front Panel
2-3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sce 1000 2xgbe

Table of Contents