Basic Sce 1000 Platform Operations; Starting The Sce 1000 Platform; Checking Conditions Prior To System Startup - Cisco SCE 1000 Installation And Configuration Manual

Hide thumbs Also See for SCE 1000:
Table of Contents

Advertisement

Basic SCE 1000 Platform Operations

This chapter describes how to start up the SCE 1000 platform, reboot, and shutdown. It also
describes how to manage configurations.
This chapter contains the following sections:

Starting the SCE 1000 Platform

Managing SCE 1000 Configurations
Performing Complex Configurations
Rebooting and Shutting Down the SCE Platform 7-9
Starting the SCE 1000 Platform
The procedures for starting the SCE 1000 platform are explained in the following sections:

Checking Conditions Prior to System Startup

Starting the System and Observing Initial Conditions
Checking Conditions Prior to System Startup
Check the following conditions before you start your SCE 1000 platform:
Both power supply units are installed and connected
First-time startup at installation:
Subsequent startups
OL-7821-04
SCE 1000 platform connected to local console (CON port)
The console terminal is turned on and properly configured
Line and Cascade interfaces are properly cabled (optional)
SCE 1000 platform is connected to at least one of the following types of management
stations:
Direct connection to local console (CON port)
Remote management station via the LAN (Mng port)
7-1
7-4
7-9
(on page 7-1)
(on page 7-2)
Cisco SCE 1000 2xGBE Installation and Configuration Guide
C H A P T E R 7
7-1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sce 1000 2xgbe

Table of Contents