Terminate Network Wiring; Set Inverter Ope/485 Switch - Hitachi L200 Series Instruction Manual

Single-phase input 200v class; three-phase input 200v class; three-phase input 400v class
Hide thumbs Also See for L200 Series:
Table of Contents

Advertisement

B–4
Connecting the Inverter to ModBus
4. Terminate Network Wiring - The RS-485 wiring must be terminated at each
physical end to suppress electrical reflections and help decrease transmission errors.
The L200 communications port does not include a termination resistor. Therefore,
you will need to add termination to the inverter if it is at the end of the network
wiring. Select termination resistors that match the characteristic impedance of the
network cable. The diagram below shows a network with the needed termination
resistor at each end.
5. Set Inverter OPE/485 Switch - The inverter serial port accepts a connection to either
the inverter keypad or the network. After removing the keypad, you will need to set a
DIP switch on the inverter to configure the port for ModBus communications. Setting
the switch will require removing the front housing cover. Remember to power OFF
the inverter before removing the cover or changing the DIP switch setting. Refer to
"Front Housing Cover" on page 2–3
Locate the OPE/485 DIP switch as shown in the figure below. Carefully move the
switch to the upper position labeled "485" (slide in direction of arrow). Then replace
the front housing cover.
At this point the electrical network connection is complete. The next step will show
how to configure parameters and settings related to ModBus communications.
ModBus
Network
SP
SN
Host device
POWER
HITACHI
HITACHI
ALARM
Hz
5 0.0
5 0.0
A
RUN
PRG
STOP
STOP
RUN
RUN
RESET
RESET
FUNC.
FUNC.
2
STR
1
1
L200
L200
for detailed instructions.
POWER
HITACHI
ALARM
Hz
Hz
5 0.0
A
A
RUN
RUN
PRG
PRG
STOP
RUN
RESET
2
STR
FUNC.
2
STR
1
L200
SR
485
TM
SK
OPE
PRG
POWER
ALARM

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents