Installing the plenum (if required)

Check to see if you are installing one of the SAN switches listed above in
the steps to install the plenum:
1.
Place the device (with inner rails attached) on a flat surface (see
NOTE:
Although
specifically, the procedure and figure also apply to installing the plenum on other models.
1. Plenum (installed)
2. 4/8 or 4/16 SAN Switch
Figure 18 Attaching the plenum to a 4/8 or 4/16 SAN Switch
2.
Obtain the plenum and four 8-32 x 0.312 Phillips pan-head SEMs screws from the accessory
kit. These are the same screws used to attach the inner rails in
3.
For each inner rail (Left and Right), use one screw hole marked 8 and one screw hole marked
16 to attach the plenum.
CAUTION:
Verify that the open end of the plenum faces the rear of the device. When installed properly, you
should see the plenum's air vent holes on one side, and the front panel of the device on the other.

Securing the switch to the outer rails

To secure the switch to the outer rails:
44
Installing and configuring an 8-Gb SAN Switch
Figure 18
illustrates how to attach the plenum to the 4/8 or 4/16 SAN Switch
Step 8
Figure
18).
3. Two screws that secure the rails to the plenum
Step 5
of the previous section.
and, if so, follow