Chapter 2. Customer Planning; Example Of A Planning Worksheet For A 2109 Switch - IBM 2109 - SAN Fibre Channel Switch Model S16 Service Manual

San fibre channel switch
Table of Contents

Advertisement

|

Chapter 2. Customer planning

|
|
|
|
|
|
|
|
| |
| |
| |
|
|
|
|
|
|
|
|
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
|
|
|
| |
| |
| |
| |
| |
|
|
|
|
|
© Copyright IBM Corp. 1999, 2000
The following information will be needed to properly configure the 2109 in an
operational environment.
Table 6 shows an example of a completed worksheet for an installed switch.
Following Table 6 is an explanation of each item in Table 6. Table 7 on page 11 is a
blank worksheet for your use. Make as many copies of Table 7 on page 11 as you
need to plan the installation of each of your switches. Provide the system
administrator with copies of the completed worksheets
Table 6. Example of a planning worksheet for a 2109 switch
Item
Firmware level
Firmware location:
Server name
Username
Directory
Switch name
Domain ID
FCnetID (Fibre-channel IP address)
FC netmask
WWN
Role
Syslog daemon IP address
Users defined - access level
SNMP information:
System description
System contacts
System location
Event trap level 0 - 5
Enable authentication traps
RW community string
RO community string
Trap recipients IP Address
License keys
The following is a description of the items in Table 6.
Firmware levels
The firmware levels for the 2109 and the required code that the service
representative is to install on an NT StorWatch Specialist workstation.
Description
V 2.1.7
C02STOR01
sanman
G:\sanman\2109\firmware\v2.1
2109-1
1
To be supplied when box is turned on
Principal switch
192.20.236.4
admin - admin, petuser - none
TestSANlet1_2109-1
(Contact name)
B/003-3 Col C-4
5
Refer to the IBM SAN Fibre Channel Switch
2109 Model S16 User's guide for additional
information.
No
dingo
pet
192.20.236.3
Required for optional features.
9