IBM 2109 - SAN Fibre Channel Switch Model S16 Service Manual page 59

San fibre channel switch
Table of Contents

Advertisement

6. If the indicator does show slow green, test it further by using the switch
diagnostic crossPortTest command. See "crossPortTest" on page 103.
7. If it is not possible or appropriate to access the switch in this fashion, replace
the short cable. If it is an IBM-approved cable, ask the customer to replace it. If
you are dealing with a long cable or one where both ends cannot be accessed
at the switch, you need to have the cable installer test the cable.
Chapter 4. Maintenance action plans
43

Advertisement

Table of Contents
loading

This manual is also suitable for:

2109 s16

Table of Contents