HP D7171A - NetServer - LPr Upgrade Manual page 14

Mass storage upgrade guide
Hide thumbs Also See for D7171A - NetServer - LPr:
Table of Contents

Advertisement

Chapter 2
1. Orient the hot-swap mass storage cage, as shown in Figure 2-2. The
backplane of the cage faces into the empty expansion bay. The connectors
on the cage's backplane are near the edge closest to the CD-ROM drive.
CAUTION
As you insert the cage, be careful not to damage the insulating
sheet covering the cage's backplane and part of one side.
Insulating Sheet
Figure 2-2. Orient and Insert the Hot-Swap Mass Storage Cage
2. Insert the hot-swap mass storage cage by sliding it carefully into the mass
storage expansion bay, as shown in Figure 2-2.
NOTE
If you are installing a secondary mass storage cage that has a
duplex board installed, connect the appropriate SCSI cables
now, before the cage is fully installed. This gives you easier
access to the SCSI connectors. Refer to the HP NetServer
Duplex Kit Installation Guide for instructions.
3. When the cage is correctly positioned, press it firmly into place, so that its
flanges are flush with the chassis front.
10
Insulating Sheet
Filler Panel (5 places)
Filler Panel (5 places)
Installation

Advertisement

Table of Contents
loading

Table of Contents