Chapter 1
Power cabling information for rack-mounted electronic components
Power, current, and component reference information
Building an HP NetServer Rack
Suggested Method for Building an HP NetServer Rack Installation
1.
Check Site Preparation
Use the Site Preparation Checklist in Chapter 2 of this reference to be sure that
all necessary preparations have been completed, including:
Customer network and software responsibility met
Site electrical power supply setup complete
Environmental and space requirements met
Precautions are taken to prevent access to the equipment by technically
unqualified personnel
Data and voice communications pre-tested
System parameters correctly configured
Hardware and cables order checked
2.
Find and Use Configuration Plans
Use the original ordering information to locate where each component goes in
the rack.
If the original ordering information is not available, use HP rack configuration
tools to plan the location of each component.
You can also use the HP NetServer rack configuration tools rack assistant to
make ordering easier and to automatically check that orders are complete. These
tools can be found on the HP web site with the URL:
http://www.hp.com/go/netserver