Chapter 5
If all drives are selected for cancellation and you wish to reverse this, perform the
following procedure.
1. Click the Clear All button, which deselects all drives for cancellation.
2. Click Close to close the Initialize Status box at any time.
Rebuild Status
If a rebuild process is currently underway, open the Rebuild Status box to monitor
the progress, or cancel the process, as shown in Figure 5-25.
The command rebuilds all logical drives that occupy any portion of the
targeted physical drive.
The Rebuild Status box displays the progress of a physical drive rebuild.
See Figure 5-26.
122
Figure 5-25. Selecting Rebuild Status
Figure 5-26. Rebuild Status Box
Monitoring
Need help?
Do you have a question about the D5970A - NetServer - LCII and is the answer not in the manual?