Compaq ProLiant 5500 Setup And Installation Manual page 62

Pentium ii xeon processor-based servers
Hide thumbs Also See for ProLiant 5500:
Table of Contents

Advertisement

1.
Pull the slide rails forward from the mounting brackets.
2.
Carefully align the server's server rails with the rack's slide rails and
slide the server into the rack.
CAUTION:
sliding the server rails into the slide rails. Tilting the server up or
down could result in damage to the rails.
Figure 3-14.
Loading the rack server
For use with Intel Pentium II Xeon processor-based servers only
Be sure to keep the server parallel to the floor when
Compaq ProLiant 5500 Servers Setup and Installation Guide