1.3.3 Scheduling a Report

When you run a report, you can run the report immediately or schedule it to be run later, either once
or on a recurring basis. For scheduled reports, you must choose a frequency and enter a time at
which the report should run.
Now: This is the default. It runs the report immediately.
Once: Runs the report once at the specified date and time.
Daily: Runs the report once a day at the specified time.
Weekly: Runs the report once a week on the same day at the specified time.
Monthly: Runs the report on the same day of the month every month, starting at the specified
date and time. For example, if the start date and time is October 28 at 2:00 p.m, the report runs
on the 28th day of the month at 2:00 p.m.every month.
NOTE: All time settings are based on the browser's local time.